LaunchBox Logo Back to Home Page
Illustration of Aljau: The Water Dam

Aljau: The Water Dam

Overview

You've been working on the newly constructed Aljau Dam for two weeks. An unexpected heavy rain has caused power outages throughout the complex.

The reservoir's capacity is increasing alarmingly. Power must be restored to open the four locks before it exceeds its maximum capacity, approximately 7,000 hm3.

The main objective is to relieve the water from the dam, otherwise it will collapse, causing a catastrophe.

Developers
Altanerus Dog
Publishers
Altanerus Dog
Platform
Amstrad CPC
Alternate Names
No information available
Wikipedia
No information available

Media

Fanart - Box - Front

Aljau: The Water Dam - Fanart - Box - Front (World) - 765x1200
World -  765 x 1200

Screenshot - Game Title

Aljau: The Water Dam - Screenshot - Game Title (null) - 768x544
768 x 544

Screenshot - Gameplay

Aljau: The Water Dam - Screenshot - Gameplay (null) - 768x544
768 x 544